Edison Elementary School HVAC and Interior Renovations
The renovation of the existing campus to include lead abatement, HVAC Chill-water system change-out, fan coil unit replacement, New Fire Protection system, Boiler replacement, window tinting, lighting and ceiling replacement, electrical system upgrade of entire campus including I.T. service rerouting and interior finishing to complete flooring and painting not originally within the scope of work that was completed in 2014. This project was a design-build team collaboration with Allstate Construction as construction manager and contractor. Additional scope was added to this project, which was phased throughout the entire summer and fall semesters to complete the extensive remodel, upgrade and abatement to this nearly 100-year-old campus.