Renovations of this historic 95-year-old school was designated an accelerated project due to the short time duration to complete the intense scope of work.
The work included: rerouting of fire suppression system, selective ceiling system with lighting system replacement, stucco replacement on building 06, window replacement of main building 01 on campus, with interior painting, carpet tile and vct flooring installation, new casework within Administration Room along with minor asbestos abatement.
Additional work to include a complete renovation of the schools Auditorium Area to include decorative lighting and sound acoustical wall paneling. Construction in the summer of 2020 and with a cost of $4,850,000.